Hilton Hotel & Living Well Health Club, Bellshill
Woolgar Hunter provided Civil and Structural engineering design services on the construction of Hilton Hotel, which includes 'Living Well' Health facilities, on Strathclyde Business Park in Bellshill.
Client: HF Group/Hilton
Architect: Cooper Cromar
Hilton Hotel & Living Well Health Club, Bellshill
Woolgar Hunter provided Civil and Structural engineering design services on the construction of Hilton Hotel, which includes 'Living Well' Health facilities, on Strathclyde Business Park in Bellshill.
The cellular nature of this 120-bedroom hotel building lent itself to the use of loadbearing masonry, supporting precast concrete flooring units, for its construction. This provided a robust and 'traditionally' buildable solution that suited the Contracting market. A steel transfer structure was provided at first floor level in order to provide the required open areas within the ground floor reception, bars and restaurants.
The leisure centre structure comprised a two-storey steel frame, with long span cellular beams to the upper floor to accommodate the swimming pool at ground floor, specifically designed to appropriate deflection and vibration criteria for the gym use.
The cellular nature of this 120-bedroom hotel building lent itself to the use of loadbearing masonry, supporting precast concrete flooring units, for its construction. This provided a robust and 'traditionally' buildable solution that suited the Contracting market. A steel transfer structure was provided at first floor level in order to provide the required open areas within the ground floor reception, bars and restaurants.
The leisure centre structure comprised a two-storey steel frame, with long span cellular beams to the upper floor to accommodate the swimming pool at ground floor, specifically designed to appropriate deflection and vibration criteria for the gym use.
Client: HF Group/Hilton
Architect: Cooper Cromar